Acceleration of permit-granting procedures
Amendments to the proposal on accelerating permit-granting procedures, focused mainly on energy projects. They address grid connection permits and deadlines for small-scale renewable installations, storage assets and recharging pools, repowering and hybridisation of existing plants, single digital portals for projects, ten-year network development plans by transmission system operators, public participation and judicial challenges, and environmental screening under the environmental impact assessment and Habitats directives, including Natura 2000 areas. Several amendments touch the overriding public interest presumption, CO2 transport and storage infrastructure, hourly Guarantees of Origin, the energy efficiency first principle, and sharing benefits of projects with local communities.
Procedure timeline
- Committee amendments tabled11 May 2026 – 27 May 2026 · including EP official documents, Feb–Jul 2026
- In progress — not yet concluded
How groups usually vote on similar files
Based on 64 past main roll-call votes on ITRE-responsible procedures, Jul 2019 → 2026-07-04.
Statistical baseline from past roll-call votes; not a forecast. · roll-call votes only
Follow this procedure — subscribe to its votes (RSS)
Official amendment documents
Connections
See these connections as a navigable graph — and walk from there to anything else.
Explore the graphMembers who amended this procedure
85 Members · by amendment countThe amendments, in full text
888 amendmentsEvery amendment as tabled — original text, proposed change and justification, with a link to the official PDF.